top of page
Adhesive.png

INSTALLATION MADE SIMPLE

GENERAL TIPS FOR INSTALLATION






















ADHESIVE



DOWNLOADS

 

Step 1: Prepare the Surface

  • Clean the wall to remove dust, old coatings, or irregularities.

  • If the wall is uneven, level it with plaster or drywall.

  • In humid areas, treat the wall with an antiseptic solution.

  • If installing a floating wall, attach a temporary support plank to level the bottom of the wall.

 

Step 2: Installation

  • Measure and mark the position of panels and other wall parts.

  • Attach the provided shims to the wall using #16 or #18 finishing nails, following the installation diagram.
    Ensure that your nail gun is adjusted so that the nails are driven flush with the surface of the shims, providing a smooth and secure base.

  • Apply construction adhesive to the shims and press the panel against the shims. Shake a little for even distribution of adhesive behind.

  • Press the panel firmly against the wall and level it on the supporting plank or the baseboard.

  • Align additional panels tightly and repeat the process.

 

Step 3: Finishing Touches

  • Install shelves on the backing wall through wall panels (please note - the panels themselves are not structural).

  • Inspect the installation to ensure all panels are secure.

The recommended adhesive "Fuze It Max" (Home Depot Product # 313740337). You may purchase it online or in Home Depot stores.

Installation Tips for Slats, Wall Panels and Flex Stone Panels

Installation Tips for “5th Avenue” Thermo-Treated Wood Panels

Installation Tips for Wood Triangles

1200px-TheHomeDepot.svg.png
Wallpanels logo_white.png

Contact

© 2025 by Walls To Go

bottom of page